
Work Trips Calendar
Join MATC members in “old fashion work trips” that could involve anything from building lean-tos and privies, to relocating trail sections, to painting blazes, to helping with corridor monitoring, to helping with Spring Clean-up on the AT.
Volunteer Opportunity – Help Set Up the Trail Crew!
Volunteer Opportunity – Help Set Up the Trail Crew! What: MATC is seeking volunteers to assist in moving our Trail Crew into the new Maine Trail Center. Tasks include transporting stored gear from Lake George Regional Park, organizing supplies, cleaning and setting up the space. Many hands make light work—join us for a few hours or the entire day! When: Saturday, April 26, from 9 AM to 3 PM (Rain date: Sunday, April 27) Where: Maine Trail Center, Skowhegan What to Bring: Work gloves Water bottle Bag lunch Weather-appropriate outdoor clothing RSVP: Email Holly Sheehan at coordinator@matc.org Driving Directions to the New Maine Trail Center […]
Skowhegan, ME United States
Privy Pre-Build
Come help with some construction fun! You can help build, organize lumber, or package materials. We will be pre-building 3 privies in Palmyra- come for one day or both! These privies will be built on-site later this season to replace the existing privies at Baldpate, Hall Mountain, and Rainbow Stream campsites.
Campsite Maintainer Workshop
Are you new to campsite maintenance? Been at it for a few years, but want a refresher? Or, maybe you've been considering taking on an assignment but want to see what's involved first? Whatever the case, join us at the West Carry Pond Campsite on May 24 for a workshop designed for campsite maintainers! We'll cover the 11 essential steps of a maintenance visit and even tackle a few tasks together.
Rainbow Stream Privy Haul and Site Prep
The Rainbow Stream campsite is getting a new privy, and we need your help! On May 31 - June 1 we'll need all the shoulders we can get to haul the lumber and materials to the campsite. We'll also do the site prep which will involve felling some trees and digging to get a flat surface. Access involves about 1.1 miles of hiking with negligible elevation gain (it's basically flat!). The group will car camp nearby.
Rainbow Stream Privy Build
The Rainbow Stream campsite is getting a new privy, and we need your help! On June 7-8 (rain dates June 14-15) we'll build the new privy. If needed, we'll also haul in any lumber we didn't get to the site the weekend prior. Access involves about 1.1 miles of hiking with negligible elevation gain (it's basically flat!). The group will car camp nearby.
Baldpate Campsite Privy Site Prep
The Baldpate campsite is getting a new privy, and we need your help! On June 21 (rain date June 22) we'll do the site prep which will involve felling some trees and digging to get a flat surface. Access involves about 2.4 miles of hiking with 1,500 feet elevation gain.
Hall Mountain Campsite Privy Site Prep
The Hall Mountain campsite is getting a new privy, and we need your help! On July 19 (rain date July 20) we'll do the site prep which will involve felling some trees and digging to get a flat surface. Access involves about 2.5 miles of hiking with 1,700 feet elevation gain.
Maine Trail Crew
The Maine Trail Crew will be working on the trail section from the West Branch Piscataquis River to Marble Brook. Volunteers are invited to help with this project! The crew will car camp near the work site and walk to the project area each day; there is minimal elevation gain from the camp site to the work site. For more information: coordinator@matc.org
Maine Trail Crew
The Maine Trail Crew will be working on the trail section from the West Branch Piscataquis River to Marble Brook. Volunteers are invited to help with this project! The crew will car camp near the work site and walk to the project area each day; there is minimal elevation gain from the camp site to the work site. For more information: coordinator@matc.org
Maine Trail Crew
The Maine Trail Crew will be working on the trail section from the West Branch Piscataquis River to Marble Brook. Volunteers are invited to help with this project! The crew will car camp near the work site and walk to the project area each day; there is minimal elevation gain from the camp site to the work site. For more information: coordinator@matc.org